IEC 60335-2-9 Toaster Durability Tester – BONAD Toasters Abnormal Endurance Test Equipment
Standards
- Primary Standard: IEC 60335-2-9 Clause 19.101
- Validation Tests:
- Electric strength test (IEC 60335-2-9 Clause 16.3)
- Endurance validation for ejector mechanisms, electrical connections, and arc prevention
Applications
- Toaster Manufacturing QA: Ensures durability under repeated abnormal operations.
- Certification Labs: Validates compliance with IEC 60335-2-9 for global market access.
- R&D Centers: Tests prototypes for failure points in ejector systems, circuitry, and heat management.
- Safety Inspections: Simulates worst-case scenarios (e.g., empty heating cycles) to prevent real-world hazards.
Features
- Universal Clamping System
- Adjustable multi-function clamps accommodate diverse toaster models (vertical/horizontal designs).
- Spring-buffered keys simulate human operation while protecting samples.
- Smart Automation
- PLC-controlled electric drives ensure precise, repeatable test actions.
- Auto-stop after preset cycles (1–9,999 tests) with real-time tracking of cycles, temperature, and current.
- Advanced Monitoring
- Infrared temperature sensors for accurate thermal profiling.
- Current detection with adjustable thresholds and visual status indicators.
- Efficient Cooling & Safety
- 100W forced-cooling fan rapidly lowers toasters to ambient temperature between cycles.
- Emergency stop button, safety shields, and fail-safe structural design.
- Customizable Parameters
- Programmable power-on/off times, cooling intervals, and cycle counts.
- Touchscreen interface for setting test variables (e.g., 6 cycles/test, 500 total operations).
- Robust Construction
- 220V/50Hz power input for global compatibility.
- Industrial-grade components for 24/7 reliability.
Technical parameters:
Input Power Supply | Single phase AC 220V, 50Hz or match client’s local power supply requirements |
Test Station | Single |
Electrical Control Method | Button control |
Drive Mode | Electrical |
Sample Clamping Method | Mechanical clamping, the position of clamping points are adjustable |
Cooling Method | Forced cooling by high-power cooling fan |
Temperature Measuring Device | Infrared temperature measurement system, when the infrared probe detects that the temperature is cooled to the set temperature, the next test is started. |
Interval Time of Pushing Switch | 0-99.9s, can be preset |
Operation Cycles | 0-9999, can be preset, default 6 cycles |
Test Times | 0-9999,can be preset, default 500 times |
Current Detecting Device | It is equipped with a device for automatically detecting the working current of the specimen: the upper and lower limits of the current detection can be adjusted, and with a light indicator indicating status. |
Why Choose Our Toaster Tester?
- Accuracy: PLC-driven automation eliminates human error.
- Versatility: Tests 95%+ of toaster designs with adaptable clamps/key buffers.
- Safety-First: Built-in shields, emergency stops, and arc/overcurrent detection.
- Efficiency: Reduces testing time 70% with automated cycles and cooling.
- Global Compliance: Direct alignment with IEC 60335-2-9 for seamless certification.